Martyn Hilbert's Railway Photography

Domov > Branch Lines

Albums

IMG_0087_28Large29.jpg
Št. slik:323, zadnja dodana 10.12.2015
Št. albumov:1 (št. strani:1)

Naključne slike - Branch Lines

IMG_0390_28800x61929.jpg
156440 at Lodge Lane Crossing.št. ogledov:18Ladies Day at Aintree Racecourse, as part of the Grand National Meeting, saw the usual class 153 on the Preston to Ormskirk line being replaced by a Class 156. 156440 approaches the occupation crossing at Lodge Lane, Farington with the 18.34 Preston to Ormskirk Service on the 8th April 2011.
IMG_0673_28800x55129.jpg
153363 New Holland Station.št. ogledov:27Opened in 1981, the basic facilities at New Holland play host to 153363 on the 30th April 2011, whilst working the 11.58 Barton on Humber to Cleethorpes.
IMG_1514_28800x53329.jpg
153324 at Ulceby.št. ogledov:11The 14.55 Northern Rail, Cleethorpes to Barton-On-Humber service is about to cross the level crossing at Ulceby on August 19th 2011. The former Great Central Railway signalbox, dating from 1910 controls the junction and level crossing here.
IMG_0053_28Custom29~3.jpg
Class 114, E56043 & E50001 at New Holland Town.št. ogledov:24Having travelled down the 1375ft long Pier from New Holland Pier Head, Class 114 2-Car DMU formed of E56043 & E50001 stands at New Holland Town with a service to Cleethorpes on Sunday 29th September 1980. With the opening of the Humber Suspension Bridge in June 1981, and the subsequent withdrawal of the ferry service from New Holland Pier to Hull, the stations and the pier were all closed on June 24th 1981.

IMG_1266_28Custom29.JPG
Oxmarsh Level Crossing, New Holland.št. ogledov:14Sunlight & Shade on the timber level crossing gates at Oxmarsh Crossing on August 31st 2014. There is only one operational line here, the other track that once led from New Holland Pier is currently out of use. Double track working re-commences to the south of the level crossing via a crossover.
IMG_1279_28Custom29.JPG
Barrow Haven.št. ogledov:29Barrow Haven station, Sunday August 31st 2014.
IMG_0001_28Custom29~4.jpg
Cravens Class 105 at Rufford.št. ogledov:15The single line token exchange is about to take place, As a Cravens Class 105 Power-Twin formed of cars M50765 & M50804, arrives at Rufford with the 16.39 Preston to Ormskirk service on April 28th 1979. The Ormskirk services were normally in the hands of Derby built Class 108s and the appearance of a Cravens unit was not common.
IMG_0032_28Custom29~4.jpg
305510 arrives at Dinting.št. ogledov:23With the disused down side platform and building on the right, 305510 arrives at Dinting with a Hadfield via Glossop to Manchester Piccadilly service on September 13th 1997.

Najnovejše slike - Branch Lines

IMG_0087_28Large29.jpg
EPS 37601 - Folkestone Harbour.št. ogledov:98As the tide begins to come in, 37601 sits on the viaduct at Folkestone Harbour with the Pathfinder Tours 'Atomic Harbourmaster' railtour on October 20th 2007. Out of sight at the other end of the train was fellow EPS class 37, 37603. This was one of the last diesel hauled trains to traverse this line. The itinerary on that day included a trip along the Dungeness Branch. It was a long day - an 06.15 start from Crewe on Saturday morning and only getting back to Crewe at 01.24 on Sunday morning!10.12.2015
IMG_3488_28Large29.JPG
Goxhill Level Crossing and Signalbox.št. ogledov:115Twilight on October 17th 2015.05.11.2015
IMG_3484_28Large29.JPG
153304 departs from Goxhill.št. ogledov:74As 153304 disappears into the gloom with the 17.55 Barton-On-Humber to Cleethorpes, the timber level crossing gates swing open to let the waiting traffic pass through. October 17th 2015.05.11.2015
IMG_3482_28Large29.JPG
Goxhill Level Crossing.št. ogledov:95Twilight on an October evening at Goxhill, as headlights illuminate the timber level crossing gates closed across Howe Lane on October 17th 2015.05.11.2015

IMG_3476_28Large29.JPG
153304 at Barton Lane Crossing.št. ogledov:48With the new lights installed for the replacement crossing, 153304 passes over Barton Lane level crossing whilst working the 09.52 Barton-On-Humber Northern Rail service on October 17th 2015. The crossing gates here are due to be replaced with barriers by the end of 2015.05.11.2015
IMG_3144_28Large29.JPG
153330 departs from New Holland.št. ogledov:65Having called at New Holland, 153330 gets underway with the 11.02 Barton-On-Humber to Cleethorpes service on Sunday 6th September 2015.01.11.2015
IMG_3141_28Large29.JPG
153330 at Barrow Road Crossing, New Holland.št. ogledov:89Amidst the industrial backdrop of New Holland, 153330 passes over Barrow Road Level Crossing with the Sunday 11.02 Barton-On-Humber to Cleethorpes service on September 6th 2015.01.11.2015
IMG_3135_28Large29.JPG
153330 at Goxhill.št. ogledov:77153330 awaits departure from Goxhill with the Sunday 09.58 Cleethorpes to Barton-On-Humber Northern Rail service on September 6th 2015.01.11.2015

Izberi jezik: