57316 at Farington.19 views57316 brings up the rear of the 'Cumbrian Statesman' as it speeds along the Down Fast, passing Farington Business Park on April 13th 2013. The train had started from Milton Keynes Central and was making for Carlisle via the Cumbrian Coast, returning via the S&C and Blackburn regaining the WCML at Farington Junction.Apr 14, 2013
57313 at Farington.11 views57313 speeds along the WCML passing Farington Business Park with 1Z62, the 05.38 Milton Keynes Central to Carlisle 'Cumbrian Statesman' on April 13th 2013. The West Coast Railways 57 is still in the base blue of former operator Arriva Trains Wales.Apr 14, 2013
DRS 66430 passes Leyland.14 viewsDRS Class 66, 66430 slams through Leyland on the Up Fast with 4M34 from Coatbridge to Daventry on April 13th 2013.Apr 14, 2013
ATW 175111 arrives at Abergele & Pensarn.19 views175111 approaches Abergele & Pensarn whilst working the 17.27 Crewe to Holyhead service on March 31st 2013. All being well the unit will be in Holyhead at 19.59.Apr 05, 2013
ATW 175106 & 175010 depart from Abergele & Pensarn.1 viewsIn soft evening light, 175106 & 175010 accelerate away from Abergele & Pensarn, having called with the 17.30 Holyhead to Crewe service on March 31st 2013.Apr 05, 2013
ATW 175110 at Llandudno.4 viewsArriva Trains Wales 3-Car Class 175, 175110 stands in the decaying remains of the once proud station at Llandudno on March 31st 2013. The unit was working the last train of the day!, the 17.10 to Llandudno Junction. Redevelopment work is now underway here, but how was the once smart LNWR station with its overall roof allowed to get into this state.Apr 05, 2013
Car No.5 - Great Orme Tramway, Llandudno.2 viewsOn the lower section of the 3ft 6in gauge Great Orme Tramway at Llandudno, Car No.5 has just departed from Victoria Terminus and is heading upwards along Old Road on March 31st 2013. The cable for hauling the trams runs in a conduit on the street running sections.Apr 05, 2013
Car No.7 - Great Orme Tramway, Llandudno.11 viewsCar No.7 climbs towards the summit on the Great Orme Tramway on March 31st 2013. The 3ft 6in gauge cable-worked line is split into two sections, with passengers having to change trams at the Halfway station. Cars 4 & 5 work the lower section, and Cars 6 & 7 work the upper section. They are the original vehicles built for the opening of the line in 1902 and were constructed by Hurst Nelson of Motherwell.Apr 05, 2013
Car No.6 - Great Orme Tramway, Llandudno.4 viewsOn the upper section of the Great Orme Tramway above Llandudno, Car No.6 descends, as Car No.7 ascends from the halfway terminus on March 31st 2013. The two cars will pass in the short loop. The remains of the heavy snowfall that affected North Wales the previous weekend are still evident.Apr 05, 2013
Virgin Voyager 221116 passes Abergele & Pensarn.15 viewsVirgin Voyager 221116 hammers along the North Wales coast as it passes Abergele & Pensarn at speed with the 12.50 Holyhead to London Euston service on March 31st 2013. From Crewe the Voyager will run under the wires to the Capital with a diesel engine under each of the five coaches - very green.Apr 04, 2013
ATW 175115 arrives at Abergele & Pensarn.24 views175115 slows to observe the 15 mph speed restriction into the down loop as it prepares to call at Abergele & Pensarn whilst working the 12.27 Crewe to Holyhead service on March 31st 2013.Apr 04, 2013
ATW 175115 arrives at Abergele & Pensarn.43 viewsArriva Trains Wales Class 175, 175115 arrives at Abergele & Pensarn whilst working the 12.27 Crewe to Holyhead service on March 31st 2013. As indicated by the splitting home signals, the 175 is about to deviate in the platform loop road.Apr 04, 2013