Últimos Envios - Branch Lines

EPS 37601 - Folkestone Harbour.98 visualizaçõesAs the tide begins to come in, 37601 sits on the viaduct at Folkestone Harbour with the Pathfinder Tours 'Atomic Harbourmaster' railtour on October 20th 2007. Out of sight at the other end of the train was fellow EPS class 37, 37603. This was one of the last diesel hauled trains to traverse this line. The itinerary on that day included a trip along the Dungeness Branch. It was a long day - an 06.15 start from Crewe on Saturday morning and only getting back to Crewe at 01.24 on Sunday morning!10 Dez, 2015

Goxhill Level Crossing and Signalbox.115 visualizaçõesTwilight on October 17th 2015.05 Nov, 2015

153304 departs from Goxhill.74 visualizaçõesAs 153304 disappears into the gloom with the 17.55 Barton-On-Humber to Cleethorpes, the timber level crossing gates swing open to let the waiting traffic pass through. October 17th 2015.05 Nov, 2015

Goxhill Level Crossing.95 visualizaçõesTwilight on an October evening at Goxhill, as headlights illuminate the timber level crossing gates closed across Howe Lane on October 17th 2015.05 Nov, 2015

153304 at Barton Lane Crossing.48 visualizaçõesWith the new lights installed for the replacement crossing, 153304 passes over Barton Lane level crossing whilst working the 09.52 Barton-On-Humber Northern Rail service on October 17th 2015. The crossing gates here are due to be replaced with barriers by the end of 2015.05 Nov, 2015

153330 departs from New Holland.65 visualizaçõesHaving called at New Holland, 153330 gets underway with the 11.02 Barton-On-Humber to Cleethorpes service on Sunday 6th September 2015.01 Nov, 2015

153330 at Barrow Road Crossing, New Holland.89 visualizaçõesAmidst the industrial backdrop of New Holland, 153330 passes over Barrow Road Level Crossing with the Sunday 11.02 Barton-On-Humber to Cleethorpes service on September 6th 2015.01 Nov, 2015

153330 at Goxhill.77 visualizações153330 awaits departure from Goxhill with the Sunday 09.58 Cleethorpes to Barton-On-Humber Northern Rail service on September 6th 2015.01 Nov, 2015

153330 arrives at Goxhill.80 visualizaçõesNorthern Rail 153330 arrives at Goxhill with the Sunday 09.58 Cleethorpes to Barton-On-Humber on September 6th 2015. The branch has four return services on Summer Sundays.01 Nov, 2015

Howe Lane at Goxhill.76 visualizaçõesIn time-honoured fashion the timber level crossing gates swing shut at Goxhill on Sunday 6th September 2015.01 Nov, 2015

Goxhill.73 visualizaçõesGoxhill level crossing in the last of the light on a late Summer evening. September 5th 2015.01 Nov, 2015

Goxhill.39 visualizaçõesA timeless scene at Goxhill on the evening of September 5th 2015.01 Nov, 2015
323 imagens em 27 página(s)